Alberto Castro Hinojosa (Master Assignment)

Planning

Estimaded Planning

Month Schedule
Week April May June
July
August
September
1

Ethereal Documentation.

Papers about delay.

First contact with the repository.

Power Point presentation.

C program to filter some connections.

 
Holidays.

RTT vs. Hops Number.

Write the definitive report and final presentation.
2

WinPcap user's manual.

min RTT C Program.

Power Point presentation.

Study the RTT of a connection during a long time.

Analysis of tcptrace.

Report: Introdution and State of the Art.

Holidays.

RTT vs. Hops Number.

Write the definitive report and final presentation.
3

Use of tcptrace with the repository data.

Filtering local connections.

Variability of TCP RTT.

 

RTT vs. Hops Number.

Final Report: Preliminary version.

Write the definitive report and final presentation.
4

Graphics about delay in the repository.

Analysis of the locations.

Holidays (28th return to Spain)

RTT vs. Hops Number.

Final Report: Preliminary version.

Final Presentation (Tuesday, 27th)