|
[1]
|
Two inequalities for Poisson probabilities (with
J.J. Dik), Proceedings
of the Royal Dutch
Academy of Sciences, Series A, 82
(1), pp. 79-94 (1979),
|
|
[2]
|
Bounding functions for Markov Decision Processes in
relation to the Spectral Radius, Operations Research Verfahren 33, pp. 461-472 (1979),
|
|
[3]
|
Determination of the Spectral Radius of a Markov
Decision Process, Operations Research Verfahren
37, pp. 487-501 (1980),
|
|
[4]
|
Nonnegative Matrices, Generalized Eigenvectors and Dynamic
Programming, in: G. Fandel et. al. (eds.),
Operations Research Proceedings 1980,
Springer-Verlag, Heidelberg,
pp. 492-499 (1981),
|
|
[5]
|
Generalized Eigenvectors and sets of nonnegative
matrices, Linear Algebra and its Applications 59, pp. 91-113
(1983),
|
|
[6]
|
R-theory for countable reducible nonnegative matrices,
Stochastics, pp. 243-271 (1983),
|
|
[7]
|
Nonnegative matrices in Dynamic Programming,
Mathematical Centre Tract 167, Centre for Mathematics and Computer Science,
Amsterdam (1983), (book)
|
|
[8]
|
Multichain
denumerable Markov Decision Processes: the optimality equations for the
average cost criterion, Transactions of the Ninth Prague Conference on
Information Theory, Statistical Decision
Functions and Random Processes, Academia (Czechoslovak Academy of
Sciences), Prague, pp. 299-304 (1983),
|
|
[9]
|
Continuous-time dynamic programming models,
Proceedings of the Fourth Formator Symposium on Mathematical Methods for the
Analysis of Large-Scale Systems, Academia (Czechoslovak Academy of
Sciences), Prague, pp. 589-602
(1983),
|
|
[10]
|
Dynamic programming models with
general nonnegative
matrices, Wissenschaftliche Zeitschrift
der Technische Hochschule Leipzig
8 (3), pp. 145-153 (1984),
|
|
[11]
|
The optimality equations in multichain
denumerable state Markov Decision Processes with the average cost
criterion: the bounded cost case, Statistics and Decisions 3,
pp. 143-165 (1985),
|
|
[12]
|
The optimality equations in multichain
denumerable state Markov Decision Processes with the Average Cost
Criterion: the unbounded cost case, CQM-note 022, Centre for
Quantitative Methods, Philips Industries (1984),
|
|
[13]
|
Asymptotic expansions for dynamic programming
recursions with general nonnegative matrices, Journal of Optimization
Theory
and Applications 54 (1), pp. 157-191 (1987),
|
|
[14]
|
Exponential convergence in undiscounted
continuous-time Markov Decision Chains, Mathematics of Operations
Research 12 (4), pp. 700-717 (1987),
|
|
[15]
|
Flexible Manufacturing: a requirement of the future,
Corporate External Relations Report, speech written for Ir. M. Kuilman, Vice-President of N.V. Philips' Gloeilampenfabrieken, delivered to the Deutsche Gesellschaft fhr Operations
Research e.V. and the Nederlandse
Stichting voor
Operations Research, September 23 (1987),
|
|
[16]
|
Flexible Manufacturing Systems: background, examples
and models (invited review) in: H. Schellhaas
et. al. (eds.), Operations Research Proceedings
1988, Springer-Verlag, Heidelberg,
pp. 142-161 (1988),
|
|
[17]
|
Production planning and inventory management in a
Telecommunication Industry (with A.G. de Kok),
Engineering Costs and Production Economics 15, pp. 267-276 (1989),
|
|
[18]
|
The use of mathematical methods in production
management (invited review), in: V. Capasso
and R. Caselli (eds.), Mathematical Methods for
Industrial Problems, ///VSP///, Utrecht
(1990),
|
|
[19]
|
Queuing analysis in flexible assembly system with a
job-dependent parallel structure (with I. Adan
and J. Wessels), in D. Pressmar
et. al. (eds.), Operations Research Proceedings
1988, Springer-Verlag, Heidelberg,
pp. 551-558 (1989),
|
|
[20]
|
Capacity analysis of automatic transport systems in
an assembly factory, in J.K. Lenstra et. al.
(eds.), Twenty five years of Operations Research in the Netherlands,
Liber Amicorum for
Prof. Dr. G. de Leve, CWI-Tract 70, Centre for
Mathematics and Computer Science, Amsterdam
(1989),
|
|
[21]
|
The design of mechanizations: reliability, efficiency
and flexibility (with G. Schuller),
CQM-report 239, Centre for Quantitative Methods, Philips Industries,
submitted for publication in International Journal of Production Research
(1989),
|
|
[22]
|
An analytical theory of multi-echelon
production/distribution systems (with L.J.G. Langenhoff),
Statistica Neerlandica 44
(3), pp. 149-174 (1990),
|
|
[23]
|
Scheduling a flexible machining centre (with
E.H.L.B. Nelissen), Engineering Costs and
Production Economics 19, pp. 249-258 (1990),
|
|
[24]
|
Analysis of the symmetric shortest queue problem
(with I. Adan and J. Wessels),
Stochastic Models 6 (4), pp. 691-713 (1990),
|
|
[25]
|
The shortest queue problem (with I. Adan and J. Wessels), in:
K.-P. Kistner et al. (eds.), Operations Research
Proceedings 1989, Springer-Verlag, Heidelberg,
pp. 434-441 (1990),
|
|
[26]
|
Analysis of the asymmetric shortest queue problem,
(with I. Adan and J. Wessels),
Queueing Systems 8, pp. 1-58 (1991),
|
|
[27]
|
Production Preparation and Numerical Control in PCB
assembly (with P.J.M. van Laarhoven),
International Journal of Flexible Manufacturing Systems 5 (3),
pp.187-207 (1993),
|
|
[28]
|
Computational approaches for stochastic multi-echelon
production-distribution systems (with G.J. van Houtum),
International Journal of Production Economics 23, pp. 223-237
(1991),
|
|
[29]
|
Production Planning in a situation with a Mixture of
Production to Order and Production to Stock (with F.A.W. Wester and J. Wijngaard),
Working Paper, Department of Industrial Engineering, Eindhoven University
of Technology (1990),
|
|
[30]
|
De rol van
informatiebetrouwbaarheid in de goederenstroombesturing (in Dutch),
in: Liber Amicorum
Prof. Dr. Ir. W. Bakker, pp. 143-159 (1991),
|
|
[31]
|
Flexible Assembly and Shortest Queue Problems
(with I. Adan and J. Wessels),
in: G. Fandel, G. Zäpfel
(eds.), Modern Production Concepts: theory and applications, Springer
Lecture Notes, pp. 644-659 (1991),
|
|
[32]
|
Analysis of the symmetric shortest queue problem with
threshold jockying (with I. Adan and J. Wessels),
Stochastic Models 7 (4), pp. 615-628 (1991),
|
|
[33]
|
Hierarchical Production Planning and multi-echelon
inventory management, International Journal of Production Economics 26,
pp. 257-264 (1992),
|
|
[34]
|
Operational Control of Automated PCB Assembly lines,
in: G. Fandel, G. Zäpfel
(eds.), Modern Production Concepts: theory and applications, Springer
Lecture Notes, pp. 146-164 (1991),
|
|
[35]
|
Analyzing multiprogramming queues by generating
functions, (with I. Adan and J. Wessels), SIAM Journal on Applied Mathematics 53
(4), pp. 1123-1131 (1993),
|
|
[36]
|
A compensation approach for multiprogramming queues
(with I. Adan, G.J. van Houtum
and J. Wessels), OR-Spektrum
15, pp. 95-106 (1993),
|
|
[37]
|
Order acceptance strategies in a Production-to-Order
Environment with Set-up times and Due Dates, (with F.A.W. Wester and J. Wijngaard),
International Journal of Production Research 30 (6), pp. 1313-1326
(1992),
|
|
[38]
|
Approximate stochastic dynamic programming: an
application to production control, in: Liber Amicorum Prof. Dr. G. de Leve,
pp. 163-173 (1991),
|
|
[39]
|
A manufacturing planning and control system for a Flexible
Manufacturing System (with J. Slomp),
Robotics & Computer-Integrated Manufacturing 10 (1/2), pp.
109-114 (1993),
|
|
[40]
|
Minimizing total weighted earliness, tardiness and
setup costs (with H.A. ten Kate and J. Wijngaard),
Working Paper LPMOR-91-8, Department of Mechanical Engineering, University
of Twente (1991),
|
|
[41]
|
Matrix-geometric analysis of the shortest queue
problem with threshold jockeying (with I. Adan
and J. Wessels), Operations Research Letters 13,
pp. 107-112 (1993),
|
|
[42]
|
Process planning for a modular component placement
system (with A. van Harten), International
Journal of Production Economics 30-31, pp. 123-135 (1993),
|
|
[43]
|
A compensation approach for two-dimensional Markov
Processes (with I.J.B.F. Adan and J. Wessels), Advances of Applied Probability 25,
pp. 783-817 (1993),
|
|
[44]
|
The effect of varying routing probability in two
parallel queues with dynamic routing under a threshold-type scheduling
(with I. Adan and J. Wessels),
IEICE Trans. Commun., Vol.
E76-B (1), pp. 29-31 (1993),
|
|
[45]
|
An approximate analysis of a capacitated
mixed-to-order/to-stock production environment (with P. Cleophas), Working Paper, Department of Mechanical
Engineering, University of Twente (1992), in preparation,
|
|
[46]
|
The impact of a flexible manufacturing system: a
longitudinal case study (with J. Slomp and G.
Gaalman), in: Proceedings
of the International Conference on Industrial Engineering and Production
Management, Mons, Belgium, pp. 297-307 (1993),
|
|
[47]
|
The compensation approach for three or more
dimensional random walks (with G.J. van Houtum,
I.J.B.F. Adan and J. Wessels),
in: K.-W. Hansmann et al. (eds.), Operations
Research Proceedings 1992,
Springer-Verlag, Berlin,
pp. 342-349 (1993),
|
|
[48]
|
Computer Integrated Manufacturing and Operations
Research, Quantitative Methods, nr. 48, pp. 127-137 (1995),
|
|
[49]
|
Multi-resource scheduling of an FMC in discrete parts
manufacturing (with G.J. Meester), in M. Munir Ahmad and William G. Sullivan (eds.): Flexible
Automation and Integrated manufacturing 1993, CRC Press Inc., Atlanta,
pp. 360-370 (1993),
|
|
[50]
|
Scheduling a single machine with release and due
dates and family-dependent set-up times (with J.M. Schutten
and S.L. van de Velde), Management Science 42
(8), pp. 1165-1174 (1996),
|
|
[51]
|
The equilibrium distribution for a class of
multi-dimensional random walks (with G.J. van Houtum,
I.J.B.F. Adan and J. Wessels),
Memorandum COSOR 94-01, Eindhoven University of Technology, Dept. of Math.
and Comp. Sci. (1994),
|
|
[52]
|
On multi-stage production/inventory systems under
stochastic demand (with G.J. van Houtum),
International Journal of Production Economics 35, pp. 391-400
(1994),
|
|
[53]
|
Development of a shop floor control system for hybrid
job shops (with G.J. Meester), Working Paper
LPOM 94-1, University of Twente, Department of Mechanical Engineering,
submitted for publication to International Journal of Production Economics
(1994),
|
|
[54]
|
Capacity Planning and Leadtime
management (with R. Buitenhek), International
Journal of Production Economics 46-47, pp. 165-179 (1996),
|
|
[55]
|
Shop floor planning and control for parts
manufacturing shops, in: P. van Beek, L. Fortuin and L. van Wassenhove
(eds.) : OR at wORk, Taylor and Francis,
pp. 111-132 (1996),
|
|
[56]
|
On the precedence relation method for deriving
flexible bound models for queueing systems
(with G.J. van Houtum, I.J.B.F. Adan and J. Wessels), Kwantitatieve methoden 51,
pp. 27-36 (1996),
|
|
[57]
|
The integration of process planning and shop floor
scheduling in small batch part manufacturing, Annals of the CIRP, Vol.
44/1/1995, pp. 429-432 (1995),
|
|
[58]
|
Deriving flexible bound models for queueing problems (with G.J. van Houtum, I.J.B.F. Adan and J. Wessels), Working Paper LPOM-95-7,
University
of Twente, Department of
Mechanical Engineering (1995),
|
|
[59]
|
Materials coordination in stochastic multi-echelon
systems (with G.J. van Houtum and K. Inderfurth), invited review in European Journal of
Operational Research 95, pp. 1-23 (1996),
|
|
[60]
|
A queueing model for a dual
resource production problem (with R. Buitenhek
and G.J. van Houtum), Working Paper LPOM-95-17,
University
of Twente, Department of Mechanical
Engineering (1995),
|
|
[61]
|
An evaluation of approximate mean value analysis
algorithms for closed queueing networks with
multiple part types (with R. Buitenhek and
G.J. van Houtum), Working Paper LPOM-95-18,
University
of Twente, Department of Mechanical
Engineering (1995),
|
|
[62]
|
Re-engineering production systems: the Royal
Netherlands Naval Dockyard, Annals of the CIRP, Vol
45/1/1996, pp. 427-432 (1996),
|
|
[63]
|
Performance analysis of a carrousel system (with
B. Rouwenhorst, J.P. van den Berg and G.J. van Houtum), in: Robert J. Graves, Leon F. McGinnis, Debra
J. Medeiros, Richard E. Ward and Mickey R. Wilhelm (eds.), Progress in
Material Handling Research: 1996, pp. 495-511, The Material Handling
Institute (1997),
|
|
[64]
|
Incomplete convolutions in production and inventory
models (with G.J. van Houtum), Operations
Research Spektrum 19, pp. 97-107 (1997),
|
|
[65]
|
Models of Warehousing systems: a concise review
(with J.P. van den Berg), Working Paper LPOM-96-7,
University
of Twente, Department of
Mechanical Engineering (1996),
|
|
[66]
|
Models for warehouse management: classification and
examples (with J.P. van den Berg), International Journal of Production
Economics 59, pp. 519-528 (1999),
|
|
[67]
|
Scheduling multi-processor tasks with precedence
constraints and release and due dates (with R. de Boer and A. van Harten), Working paper LPOM-96-9,
University
of Twente, Department of
Mechanical Engineering (1996),
|
|
[68]
|
Planning
en besturing van intern transport en magazijnsystemen (with J.P.
van den Berg and R.J. Mantel), in: J.P. Duijker,
M.B.M. de Koster and M.J. Ploos van Amstel (eds.): Praktijkboek Magazijnen en distributiecentra, ch. 3.5.B, pp. 1-25 (1996),
|
|
[69]
|
An open queueing model for flexible
manufacturing systems with multiple part types and general purpose pallets
(with R. Buitenhek and G.J. van Houtum), in: J. Ashayeri,
W.G. Sullivan and M. Munir Ahmad (eds.): Flexible
Automation and Intelligent Manufacturing 1999, Begell
House, Inc., New York, pp.
713-734 (1999),
|
|
[70]
|
Concurrent Manufacturing Planning and Control
(with M.M.T. Giebels and H.J.J. Kals), Proceedings of
the 29th CIRP working seminar on Manufacturing Systems, pp.
133-138 (1997),
|
|
[71]
|
A decision support system for ship maintenance
capacity planning (with R. de Boer and J.M.J. Schutten),
Annals of the CIRP, Vol. 46/1/1997, pp. 391-396 (1997),
|
|
[72]
|
Bounds for performance characteristics: a systematic
approach via cost structures (with G.J. van Houtum,
I.J.B.F. Adan and J. Wessels),
Commun. Statist.-Stochastic
Models 14 (1&2) pp. 205-224 (1998),
|
|
[73]
|
Performance analysis of parallel machines with a
generalized shortest queue arrival mechanism (with G.J. van Houtum, I.J.B.F. Adan and J. Wessels), OR
Spektrum, vol. 23, pp. 411-428 (2001),
|
|
[74]
|
Capacity analysis of an automated kit transportation
system (with R. Buitenhek, G.J. van Houtum and I.J.B.F. Adan),
Annals of Operations Research 93 (2000), pp. 423-446,
|
|
[75]
|
AMVA based solution procedures for open queueing networks with a population constraint (with
R. Buitenhek and G.J. van Houtum),
Annals of Operations Research 93 (2000), pp. 15-40,
|
|
[76]
|
Dynamic Manufacturing Planning and Control (with
H.J.J. Kals and M. Giebels),
Production Engineering: research and development (Annals of the German
Academic Society for Production Engineering), vol. V(2), pp. 107-110
(1998),
|
|
[77]
|
Spare parts management at complex technology-based
organizations: an agenda for research (with W.D. Rustenburg and G.J.
van Houtum), International Journal of Production
Economics 71, pp. 177-193 (2001),
|
|
[78]
|
A prototype implementation of integrated order
planning (ETOPLAN) (with M.M.T. Giebels and
H.J.J. Kals), in: Z. Katz and N.D. du Preez: Proceedings
of the International Conference on Quality Manufacturing, Stellenbosch, South Africa, pp. 79-84 (1999).
|
|
[79]
|
Warehouse Design and Control: a framework and a
literature review (with B. Rouwenhorst,
B. Reuter, V. Stockrahm, G.J.
van Houtum and R.J. Mantel), invited review in:
European Journal of Operational Research 122, pp. 515-533 (2000).
|
|
[80]
|
De
onoverkomelijkheden van het MRP paradigma: planning binnnen
een tijdgebaseerde bedrijfsvoering versus kostengebaseerde
bedrijfsvoering(with M.F. van Assen and S.L. van de Velde),
Bedrijfskunde, Vol. 73 (4), pp. 55-64 (2001),
|
|
[81]
|
Shop Floor Scheduling in Discrete Parts Manufacturing
(with G.J. Meester, J.M.J. Schutten
and S.L. van de Velde), in: A. Villa and P. Brandimarte (eds.), Modeling Manufacturing Systems:
From Aggregate Planning to Real-Time Control, Springer (1999),
|
|
[82]
|
Implementation of an engineer-to-order manufacturing
planning system (ETOPLAN) (with M.M.T. Giebels
and H.J.J. Kals), in: J. Ashayeri,
W.G. Sullivan and M. Munir Ahmad (eds.): Flexible
Automation and Intelligent Manufacturing 1999, Begell
House, Inc., New York, pp.
621-630 (1999),
|
|
[83]
|
Operations Research en ketensimulatie, in: T.M.A. Bemelmans,
P.M.E. de Braa, M. Looijen en G. van Oortmerssen (red.): ICT (Informatie- en
Communicatietechnologie) Zakboekje, PBNA, Arnhem,
pp. 339-352 (in Dutch) (1999),
|
|
[84]
|
Capacity loading by column generation techniques
(with E.W. Hans, A.J.R.M. Gademann and S.L. van de Velde),
BETA working paper, Eindhoven University of Technology, Faculty of
Technology Management (1999),
|
|
[85]
|
Building holarchies for
concurrent manufacturing planning and control (with M.M.T. Giebels and H.J.J. Kals),
Working Paper, University of
Twente,
Department of Mechanical Engineering (1999),
|
|
[86]
|
Spare part management for technical systems: resupply of spare parts under limited budgets (with
W.D. Rustenburg and G.J. van Houtum), IIE
Transactions 32, pp. 1013-1026 (2000),
|
|
[87]
|
Towards Intelligent Manufacturing Planning and
Control, invited review in: OR Spektrum 22,
pp. 313-345 (2000),
|
|
[88]
|
Systeemgericht
bevoorraden bij de Koninklijke Marine (with W.D. Rustenburg and G.J. van Houtum),
in: H. van Delft, M. Smit-Loos (eds.), De toekomst in spare parts en service, Jaarboek 1999, Parts
Business Forum, Districon, Maarssen
(1999),
|
|
[89]
|
Unitload, a decision
support system for warehouse design (with B. Rouwenhorst,
J.P. van den Berg and R.J. Mantel), International Journal of Flexible
Automation and Integrated Manufacturing, 7 (1&2), pp. 115-127 (1999),
|
|
[90]
|
Finite Capacity Planning (FCP) in EMTO Discrete Parts
Manufacturing Environments: research issues and perspectives (with M.F.
van Assen and S.L. van de Velde),
Working Paper, University of
Twente,
Faculty of Mechanical Engineering (1999),
|
|
[91]
|
Capacitated Two-Echelon Inventory Models
for Repairable Item Systems (with Z.M. Avsar),
in: S.B. Gershwin et al. (eds.): Analysis
and Modeling of Manufacturing Systems, pp. 1-36, Kluwer
Academic Publishers, Boston
(2002)
|
|
[92]
|
On
the relation between cost and service models for general inventory
systems (with G.J. van Houtum), Statistica Neerlandica 54 (2),
pp. 127-147 (2000).
|
|
[93]
|
Order picking in carousel systems under the nearest
item heuristic (with N. Litvak,
I. Adan and J. Wessels),
Probability in the Engineering and Informational Sciences 15, pp. 135-164
(2001)
|
|
[94]
|
Capacitated
two-indenture models for repairable item systems (with Z.M. Avsar), Int. Journal of Production Economics 81-82
(2003), pp. 573-588.
|
|
[95]
|
Design and Analysis of Reconfigurable Layout Systems (with
S. Heragu, G. Meng and J.C.W. van Ommeren),
Working Paper, University of
Twente,
Faculty of Mathematical Sciences (2001), submitted to IIE Transactions.
|
|
|
[96]
|
Analysis of Cellular Manufacturing Systems (with
S. Heragu, G. Meng and
J.C.W. van Ommeren), Proceedings of the FAIMS
2001 Conference, Dublin, Ireland (2001).
|
|
|
[97]
|
Performance
Analysis of Adaptive Layout Systems (with S.S. Heragu
and G. Meng), in: Proceedings of the Eleventh
Industrial Engineering Research Conference, Orlando, FL, May 19-21, 2002
(publication on CD-ROM, Institute of Industrial Engineers).
|
|
|
[98]
|
Reconfigurable
Layout Problem (with S.S. Heragu and G. Meng), International Journal of Production
Research, vol. 42, no. 22, pp. 4709-4729 (2004).
|
|
|
[99]
|
Los tratamientos
del sistema de gestión de recambios permiten reducciones de costes significativas y controladas (The application of replacement management
systems allow for significant and controlled cost reductions) (with
W.D. Rustenburg, B. Busters and G.J. van Houtum),
Ingenieria y Gestión de
Mantemimiento 25 (sept/oct
2002), pp. 29-37,
|
|
|
[100]
|
Two level
Manufacturing System Performance Analyzer (with G. Meng
and S.S. Heragu), DSES Technical Report #38-02-488,
Rensselaer Polytechnic Institute (submitted to Manufacturing and Service Operations Management).
|
|
|
[101]
|
Design and Performance Evaluation of Agile
Manufacturing Systems (with S. Heragu), Proceedings of the Tenth Industrial Engineering Research
Conference, Dallas, Texas
(2001).
|
|
|
[102]
|
Spare Parts Management bij de Nederlandse Koninklijke
Marine (with W.D. Rustenburg and G.J.
van Houtum), Bedrijfskunde, vol. 73, pp. 28-39 (2001).
|
|
|
[103]
|
Stochastic Modeling
and Optimization of Manufacturing Systems and Supply Chains (with J.G. Shanthikumar and D.D. Yao), Kluwer Academic Publishers, Boston
(2003) (book)
|
|
|
[104]
|
Multi-Echelon,
Multi-indenture Spare Parts Systems (with W.D. Rustenburg and G.J. van Houtum), in: J.G. Shanthikumar,
D.D. Yao and W.H.M. Zijm
(eds.): Stochastic Modeling and Optimization of Manufacturing Systems and
Supply Chains, Kluwer Academic Publishers (2003),
pp. 143-176.
|
|
|
[105]
|
A tribute to John
A. Buzacott, in J.G. Shanthikumar,
D.D. Yao and W.H.M. Zijm
(eds.): Stochastic Modeling and Optimization of Manufacturing Systems and
Supply Chains, Kluwer Academic Publishers (2003),
pp. 1-5.
|
|
|
[106] |
Coordination mechanisms for inventory control in
three-echelon serial and distribution systems (with J.B. Timmer),
Memorandum 1738, Dept. of Applied Mathematics, Faculty of Electrical
Engineering, Mathematics and Computer Science, University of Twente, the
Netherlands (2004). |
|
|